Contact us

High-Speed 2 Panels Center Opening Landing Door Device

Advantage of High-Speed 2 Panels Center Opening Landing Door Device

  • The life test times of the landing door lock ≥ 3 million, The applied voltage: DC110V or AC110V 

  • In accordance with GB7588 Standard No. 1 modified single pendulum test requirements

  • Match cold drawn solid guide rail, run more smoothly

  • The methods of forced close: Double hammer



JJ

800

900

1000

1100

1200

1300

1400

HH

2000≤HH≤2600

Remark

Side opening landing door device-SL interface



High-Speed 2 Panels Center Opening Landing Door Device Intallation

High-Speed 2 Panels Center Opening Landing Door Device Intallation
High-Speed 2 Panels Center Opening Landing Door Device Intallation
You May Also Like
Related Application
Related Cases
Dongguan-Huizhou Intercity Rail Transit Project
Dongguan-Huizhou Intercity Rail Transit Project
The Dongguan-Huizhou intercity rail transit elevator project is one of the backbone rail transit projects in the Pearl River port area. Our company provides all elevator door systems (PMA2C-L door mac...
Shenzhen Huizhou Jinshan Longting Mansion Elevator Project
Shenzhen Huizhou Jinshan Longting Mansion Elevator Project
Shenzhen Huizhou Jinshan Longting No. 8 Mansion Elevator Project, our company provides all elevator door systems (PMA2C-L door machine system, car door lock with door knife system).
Leave us a message
Room 101, Building 3, No.1, Nangonghe Road, Hangzhou Qianjiang Economic Development Zone.
fwlsales@faiveleytech.com
+86-18858346991